<?xml version="1.0"?>
<!-- Copyright 2014-2015 The MathWorks, Inc. -->
<rsccat version="1.0" locale="en_US" product="MATLAB">
  <message>
    <entry key="wrongTypeForW">The start day of the week is a numeric integer.</entry>
    <entry key="checkRangeForW">The start day of the week is in the range of 1 to 7.</entry>
    <entry key="dimensionsMismatch">Matrix dimensions must match.</entry>
    <entry key="wrongTypeForE">The last input takes 0, 1, or logical value(s).</entry>
  </message>
</rsccat>